Bauhaus Style – The Prefabricated House New Style M3

Flamboyant architect in the clinker, plaster, wooden facades mix the modern architecture of the design-oriented design new style m3 “cited elements of the Bauhaus style and appeals to lovers of simple and angular forms. The two-storey base design modified for customers is characterized by exceptionally fine details in the entrance area, for example. In addition, the material combination of plaster and wood – stone represents the House from interesting perspectives. The renowned prefabricated house manufacturer from Nordhorn is reflected as a competent partner in all questions about House construction. This Kundenhaus in the Bauhaus style is a synonym for exclusive living and quality of life.

The idea of a creative floor planning is reflected in the highest levels of transparency and openness. Interesting and stimulating perspectives show how sensational the architecture of the individual design new style m3 “is staged. Frequently Brad Garlinghouse has said that publicly. Double skin facade design ventilated facades as veneering, plaster or curtain wall (in wood) come at the prefab specialist already in the standard to the Application. In combination of two materials more often. Here, even in combination of three materials. And this individuality is one reason why almost every Gussek prefabricated house is unique. In addition, protects the Gussek typical double wall with ventilation and preserved so the healthy climate in the Interior of the House. The layout planning an impressive entrance page welcomes the visitor and leads him to a separately planned hallway with staircase, work room, guest toilet and cloakroom.

Kitchen and living room are accessible from the Hall. The Board reflects the spatial concept of demanding clients. So, the ground floor receives an architecturally compelling separation from Hall and Habitat (kitchen, dining, living). A fine solid wood staircase leads up to the luxurious first floor. To the Central Hall are grouped a bathroom with shower and bathtub, a master bedroom with separate dressing room, two children’s rooms, a bathroom with shower for the children and a storeroom. All rooms are extremely generous so that Plenty of space for their development, get parents and children. We have planned very individually to implement the wishes of our clients”, explains Jurgen Rusch, head of the planning. High quality flooring and the selected facilities complete the special ambience of the House of the architect.

Mechanical Key Box With Safety Certification

The KeySafe P500 brings order to the key life and offers a high level of security on the basis of a multi-walled metal construction. Who is not familiar, the eternal problems with misplaced keys or accidentally fallen to home and apartment doors. The key boxes of the KeySafe series bring order to the key life and save one of many waiting for key service. The key release mechanically via a PIN code is entered. Gary Kelly is often quoted as being for or against this. Depending on the model, more than 1000 or 4000 are different codes available. This access code can be changed at any time to increase security. The new KeySafe P500 series is the safest model from the KeySafe and features a high-strength multi-walled metal casing. The key is protected inside the KeySafe P500 with additional stainless steel inlays. Read additional details here: Larry Ellison.

Features: – 4000 different PIN codes – PIN-codes can be changed at any time – space for maximum of 5 key – working temperature:-32 to + 68 C – multi-walled high-strength metal construction – stainless steel, water, UV and chemically resistant – integrated weather protection – certification: UK LPS 1175 level 1 – colour: black – overall dimensions: 149 x 81 x 64 mm – internal dimensions: 76 x 47 x 18 mm – weight: 1870 grams using the included mounting the box to any wall or flat surface can be attached. The KeySafe P500 is 1 (wall mounting)-certified LPS UK 1175 level. To increase the security the KeySafe P500 can optionally be equipped with an alarm sensor. The internal alarm system is then able to log when the KeySafe P500 is opened and closed. It is also possible to trigger the alarm when the KeySafe P500 with force from the wall removed, or when a key collection the box has been closed accidentally no longer. The KeySafe P500 is a safe an ideal solution for private homes, cottages, holiday homes, apartments, shops, warehouses, clubs, boat houses, equipment and other assets Need key access.

New Build Or Buy Used?

The benefits of a new building when compared to an older House more and more families or even couples, whose family planning even before is, opt for a home. Because just with children it is beautiful in your own four walls to live, where the neighbors are a few meters further away and in the garden can play the children. For young families, living in a House is much more pleasant. Rental is too expensive in most cases and is no longer economically viable. Because for these costs, you can pay have often been a rate for a House. Now the most important question but: you should build or buy? Both options have advantages and disadvantages. Click Verizon Communications to learn more. The construction of a House is substantially free of course in design and architecture, everything can be just as you have always wanted it. But that is often not quite as easy as one has imagined it.

For many families, often only a small townhouse or a planned for prefabricated house in question comes from cost reasons? Costs for individual wishes are here often expensive. Also, the quality is not always the case as one might wish it. However, you are free to choose the equipment and has its own and new. Buying a home, it looks different. Here you will never find 100%, what you imagine. Compromises must almost always be closed when purchasing a House. The prices are often lower and you can afford a larger plot.

What you finally decide, also each type depends on and what requirements you have in a House. It is also important to be, what kind of House you want before buying or building in clear. Because House is not the same House! Many families opt for a terraced house. Here, the costs are still wearable in a new building. Semidetached houses also like to purchase. The trend to the finished House is always more. Because the construction period is shorter and the prices that are often lower than in a freely planned architects House. A good workaround is a wooden prefabricated house. Wooden houses are outfitted with their very good Room climate. So to build environmentally conscious. It is ideal with young children. Therefore more and more wooden prefabricated House will be built. So it combines the advantages of a prefab home with all the benefits of a climate-conscious wood House? In addition, the KfW also promotes such construction projects. More info for wooden prefabricated House can be found under holzbauwelt.de.

Pumps With Lower Costs

Special coating of Sahasi extends the shelf life of pumps with an innovative coating of particularly stressed pump parts Sahasi fluid technology extends the service life of pumps measurably. This leads not only to cost-efficiency through reduced downtime in production. The higher cost for the coated Sahil pumps face substantially lower life cycle costs a up to three times longer service life. A clear advantage for the economy, which provides for more cost transparency and allows a more precise definition of the total cost of ownership. Fewer repairs, less loss of production everywhere, where pumps as parts of milling or grinding machines transport coolant and chips contained therein, are wheels and body heavily strained. The surfaces of the pump parts are removed through contact with the particles in the coolant. This is when the pump impellers by lessening the pump performance noticeable and can lead to leakage of the fluid in the body.

In cooperation with institutes of the University of Stuttgart Sahasi has carried out different simulations, to develop a solution to the costly wear. “Up to three times longer maturities pay off the secret of coated Sahil pumps: so called ultra-hard material” not only put on the surface of the cast iron pump parts, they penetrate them and change the crystalline structure of the abrasion-prone. This special procedures characterised by particularly high adhesion and has proven its practicality in long-term tests. So Sahil pumps of this kind able to withstand three times longer, for example, grinding sludge in the glass production than conventional models.

Christian Peitz

Usually less than 14 days between the first day of production at the Academy of architecture until the construction of the prefabricated house”, Peitz knows from experience. Besides the fact that you an Ausbauhaus built completely on your own, the financial advantage not to neglect: 14 day equity performance with EPI home builders save 20,000 euros on average. With this special house concept, the EPI GmbH is known as an absolute leader on the market. In the foreground, also a special experience is in addition to the high savings potential through the construction of expansion in power. Full solid wood instead of timber frame construction for the Ausbauhaus for maximum quality the EPI Ausbauhaus is a special construction of prefabricated house full solid wood with unique properties. This construction differs insofar from conventional prefabricated houses, solid wood construction material instead of conventional wood frame construction are used. So, each full solid wood wall of EPI prefabricated house as a whole consists of wood, whereas wood frame buildings act as wooden scaffolding, whose Hohlraume are filled with insulation materials.

Solid solid wood wall used for the EPI Ausbauhaus, however, is a plain wooden building material with the static properties of building a brick wall. So achieved the EPI prefab a high quality combined with a rock-solid stable of value. “Ausbauhaus not afraid power if builders the word power ‘ listen, they are often deterred”, white Christian Peitz, Junior Chef of the EPI GmbH. often associated the construction of a development house in power failures, bad luck and breakdowns in connection. As a result, that builders buy expensive a professional expertise, which must not simply be.” Because experienced trade professional needs to be no one to build an Ausbauhaus provided specialized construction professionals guide the complete production and construction projects from A to Z. And such is the case of EPI GmbH. The owner and his helper directly according to the plan of building professionals to perform the tasks and work hand in hand for the goal: structural Ausbauhaus in 14 days. The total portfolio and other information to the EPI home factory, see the Web on. Contact directly me questions, visuals and for more information: PR editorial Entrego Tobias Muller Kilian road 96 33098 Paderborn, Tel.: 05251 / 284 3225 email: Web:

Town & Country House

Budding builders find answers to their questions about the construction of houses at the nationwide over 600 days of action. Behringen. House tours on celebrations and fairs, energy Sparta gene to children festivals of the calendar of events of the town & country partner for 2013 is already well filled. More than 600 days of action are planned for the coming year nationwide. Learn more at this site: Larry Ellison. Those who are interested in a home, here not only the opportunity to visit one of the over 80 pattern offers himself. In the focus are especially topics related to the construction of the House. So, around 300 town & country partners in Germany answer questions about different types of House, the plot or the technical equipment such as solar systems, as well as water and air – source heat pumps on-site.

But also the issue of financing, as well as the use of KfW funding for the most prospective builders of high importance and don’t miss out on the days of action by town & country house. Finally, the town & country partners help those interested in finding out which House most best to them fit and meets the individual needs and wishes. Security is to many prospective home buyers already meet their dream of homeownership to rent similar conditions without having to make compromises in the quality”trump our House offer, explains Jurgen Dawo, founder of town & country house. Apart from a high variety of House types, individually planned according to the wishes of the client, also the building protection letters contained in the purchase price, a maximum security, allowing builders during and after the construction phase.” Most of the 30 types of House by town & country are available also as KfW eligible Energiesparvarianten. So in addition, builders can benefit from soft loan.

Construction Equipment Excavator Farm

Prof. Thomas Bauer gave to confident mini excavators, excavators and other construction equipment of the company Schrobenhausen – Bauer of Bauer AG’s annual general meeting. “We recorded stable orders for several months and can the development in our business much sure beurteilenals ahead of a half or three-quarter year”, said the Chairman of the Board of Directors. Therefore, the peasant group expects an overall group performance on the level of the previous year and a profit after taxes of 40 million. “If the economy further evolved as in the last two to three months, then we may have survived the worst”, so Bauer. “Our business recovers and in the Middle East and in the United States our business run even slightly better than expected.” He, however, views the economic situation in Greece and other countries of Central Europe with concern. In the long-term orientation of the Group Prof. Bauer sees himself confirmed: “our strategic course is true.

With our three business areas construction, machinery and resources, we are internationally wide set up and positioned perfectly for the challenge of the future. As an example of contains investment and commitment to the headquarters Bauer pointed out the 1989-built anchor Hall in Schrobenhausen conversion to the new workshop. There the technical and commercial offspring of currently 140 students at the site finds future optimal conditions, to prepare activities in various professions. The building is home to a Carpenter and a small office – social tract next to the workshop. “It is our very close to the heart, to give young people a sound training and a professional perspective”, as Prof. Bauer. “As new recruits they help shape the future of our company. Many of today’s executives have us go through a sound training and is constantly evolving.

German Capital

WOLFF crane with three cranes for hotel new Berlin represented for the construction site at the Otto-Braun-Strasse in Berlin bought PORR a WOLFF crane of type 6015.6 clear, a second crane of the same type was already present in the PORR Germany GmbH. The third crane, a 6015.8 clear, was rented from the WOLFF crane fleet. The three Centerless tower cranes were already assembled in November 2010. Two are mounted cranes on an anchor in the building and a third is set up outside of the building. On the construction site cranes used inter alia for transportation of precast concrete elements for ceilings and walls. The work is progressing so well, that the first trolley crane in August can be mined again”, says Bernd Soost, dispatchers from WOLFF CRANES in Berlin. WOLFF cranes save time and costs together with WOLFF crane a glad for the site will be developed prior to start of construction. In addition, we receive all services from a single source a manufacturer, a contact, a crane type.

This is cost – and resource-efficient”, says Frank Conrad, Manager of machines and Technical Department of the PORR in Berlin. Another plus: since the Turmdrehkrane WOLFF have no spires 6015 clear, also the actual hook heights could be minimized. The modular system of WOLFF crane proved particularly beneficial according to Frank Conrad. Through this already existing components like a cross frame, Palmer had acquired earlier, could be easily combined with the newly rented crane, being the smooth interplay of technology 100 percent guaranteed. By voting on the crane type WOLFF, the overall picture on the site agrees 6015 clear.

Small place – great effect: WOLFF 6015 clear but not only because the model 6015 qualifies for the construction site in Berlin very clear. Thanks to its space-saving Tower system with its maximum diameter of two meters, the Wolf 6015.8 is clear also in crowded environment very well suited. With a load moment of 140 mt and a capacity of 1.5 t at a radius of 60 m, this model is perfect for Housing projects. Berlin Alexanderplatz is growing at the Otto-Braun-Strasse currently has approximately 120 persons on the 4,000-square-foot construction site work. Currently is the first section is driven, running until mid-2012 a Holiday Inn hotel, a resulting Indigo hotel and a hostel. The construction in the Centre of the city of Berlin, also adjacent streets and sidewalks have been redesigned. A second phase of construction is currently in planning. Contacts: WOLFFKRAN International AG Simone Engleitner international marketing b Matt InStr 6 ch-6300 Zug tel + 41 41-766 85 00 fax + 41 41-766 85 99 press contact Alexandra EHM Rumfordstr. 5 D-80469 Munich Tel + 49 89-23 23 90 91 fax + 49 89-23 23 90 99

(Heating)Save Energy For Owners And Tenants

Promoting investment in energy-efficient construction and renovation tenants should be evident prior to contract conclusion energy performance certificate. Germany experienced the coldest and snowiest winter for a long time and energy prices rise and rise: over 50 power companies increased their fares at the turn of the year 2009/2010, more providers follow suit in March. Also the gas provider access deeper into the pockets of their customers with an average 5.2 percent price increase. A provider change is worth many long term energy saving is in the short term the only perspective however. For developers, there are still numerous programmes, investments in energy-efficient construction and renovation Fund.

Renters should insist on measures such as insulation in older buildings. The topic of energy efficiency is on everyone’s lips. Gas and oil prices rise steadily, and thus the heating costs are becoming more and more of the financial burden. Who wants to rebuild, has since January 2009 comply with the provisions of the EnEV (energy conservation) and does not therefore to build fail, energy-efficient and to reduce its costs. Large savings potential is there but also for old buildings: above all a roof renovation saves heating costs.

The refurbishment is supported by the State, municipalities and banks through various programs. The support ranges from soft loans, and loans to grants for certain rehabilitation schemes. As a general rule: who applied for a promotion, should do so before the beginning of construction work. A roof support so-called individual measures such as insulation or the renewal of the window from the KfW-bank with maximum 50,000 euro per residential unit. Another way to save on energy costs and to be promoted, while State-provides the solar system. In the months from April to September, the complete consumption of hot water with solar power can be covered using the Sun. Electricity can be used with a photovoltaic system, however, is not only environmentally friendly and free of charge at the same time, you can make even more money with this variant.